Pictures by Eric Duston
Work progressing on the left hand side of the doorway .
Bricks being set into the centre of the wall,on this magazine the wall is three courses of bricks thick .
Colin checking the bricks are level
Work progressing on the right hand side of the door,note the slots for the original wooden floor joists.
Another brick goes into place